Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
128
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0229 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,948 | $14,000 | n/a |
DL0229 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $104,868 | $500,000 | n/a |
DL0229 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $44,923 | $1,275 | n/a |
DL0229 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $8,303 | $0 | n/a |
DL0229 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $61,397 | $0 | n/a |
DL0229 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $32,353 | $0 | n/a |
DL0228 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,279 | $0 | n/a |
DL0228 # 01 Y:2023 | 01 | 2023 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $4,024 | $700 | n/a |
DL0228 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,115 | $4,102 | n/a |
DL0228 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,322 | $37,499 | n/a |
DL0228 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,512 | $73,200 | n/a |
DL0228 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,227 | $350 | n/a |
DL0227 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,298 | $0 | Implemented |
DL0227 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM TEMPERATURE | $6,362 | $0 | Implemented |
DL0227 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,653 | $0 | Implemented |
DL0227 # 05 Y:2023 | 05 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $3,640 | $10,608 | Not Implemented |
DL0227 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $5,836 | $30,292 | Implemented |
DL0227 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,027 | $552 | Not Implemented |
DL0226 # 08 Y:2023 | 08 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $6,284 | $3,000 | Not Implemented |
DL0226 # 09 Y:2023 | 09 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,355 | $9,585 | Implemented |
DL0226 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $1,234 | $0 | Implemented |
DL0226 # 04 Y:2023 | 04 | 2023 | REDUCE VENTILATION AIR | $2,739 | $0 | Not Implemented |
DL0226 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,718 | $0 | Implemented |
DL0226 # 10 Y:2023 | 10 | 2023 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $56,102 | $91,218 | Implemented |
DL0226 # 05 Y:2023 | 05 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,421 | $3,000 | Not Implemented |