Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,993
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0631 # 02 Y:1997 | 02 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,202 | $0 | Not Implemented |
GT0631 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,860 | $300 | Implemented |
GT0631 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,350 | $11,600 | Not Implemented |
GT0631 # 05 Y:1997 | 05 | 1997 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $2,485 | $0 | Not Implemented |
GT0631 # 06 Y:1997 | 06 | 1997 | REDUCE VENTILATION AIR | $11,330 | $10,500 | Not Implemented |
GT0631 # 07 Y:1997 | 07 | 1997 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $3,460 | $1,000 | Not Implemented |
GT0631 # 08 Y:1997 | 08 | 1997 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $27,982 | $2,100 | Not Implemented |
GT0630 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,900 | $20,800 | Implemented |
GT0630 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,370 | $500 | Implemented |
GT0630 # 03 Y:1997 | 03 | 1997 | DISCONNECT BALLASTS | $153 | $280 | Implemented |
GT0630 # 04 Y:1997 | 04 | 1997 | COMBINE UTILITY METERS | $2,920 | $0 | Not Implemented |
GT0630 # 05 Y:1997 | 05 | 1997 | OPTIMIZE PLANT POWER FACTOR | $6,200 | $3,900 | Not Implemented |
GT0630 # 06 Y:1997 | 06 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $7,540 | $6,700 | Implemented |
GT0630 # 07 Y:1997 | 07 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,580 | $0 | Implemented |
GT0630 # 08 Y:1997 | 08 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $800 | $0 | Not Implemented |
GT0630 # 09 Y:1997 | 09 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $17,600 | $26,600 | Not Implemented |
GT0628 # 01 Y:1997 | 01 | 1997 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $86,500 | $120,000 | n/a |
GT0628 # 02 Y:1997 | 02 | 1997 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $186,200 | $245,000 | n/a |
GT0628 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,903 | $37,960 | n/a |
GT0628 # 04 Y:1997 | 04 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,263 | $5,550 | n/a |
GT0628 # 05 Y:1997 | 05 | 1997 | MINIMIZE WATER USAGE | $2,924 | $0 | n/a |
GT0628 # 06 Y:1997 | 06 | 1997 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $23,066 | $72,100 | n/a |
GT0628 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,000 | $0 | n/a |
GT0629 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,784 | $2,500 | Implemented |
GT0629 # 02 Y:1997 | 02 | 1997 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $525 | $150 | Implemented |