IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0363 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,945 $200 Not Implemented
GT0363 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $380 $370 Not Implemented
GT0363 # 03 Y:1988 03 1988 AIR CONDITION ONLY SPACE NECESSARY $930 $840 Not Implemented
GT0363 # 04 Y:1988 04 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $12,120 $4,685 Not Implemented
GT0363 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $472 $377 Not Implemented
GT0363 # 06 Y:1988 06 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $66,800 $45,607 Not Implemented
GT0363 # 07 Y:1988 07 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,540 $32,000 Not Implemented
GT0363 # 08 Y:1988 08 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $163 $150 Not Implemented
GT0360 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,741 $21,965 Implemented
GT0355 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $300 Implemented
GT0354 # 01 Y:1988 01 1988 INSTALL SET-BACK TIMERS $10,948 $1,800 Not Implemented
GT0354 # 02 Y:1988 02 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,524 $10,400 Not Implemented
GT0354 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,340 $5,950 Not Implemented
GT0354 # 04 Y:1988 04 1988 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $25,532 $80,640 Not Implemented
GT0355 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $702 $85 Implemented
GT0355 # 04 Y:1988 04 1988 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $136 $140 Not Implemented
GT0355 # 05 Y:1988 05 1988 USE RADIANT HEATER FOR SPOT HEATING $11,594 $25,480 Implemented
GT0355 # 01 Y:1988 01 1988 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,437 $7,830 Not Implemented
GT0351 # 05 Y:1988 05 1988 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,560 $4,190 Not Implemented
GT0350 # 01 Y:1988 01 1988 REDESIGN PROCESS $20,803 $89,500 Implemented
GT0351 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $920 $540 Not Implemented
GT0351 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36 $25 Not Implemented
GT0351 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $373 $2,000 Not Implemented
GT0351 # 01 Y:1988 01 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $600 $0 Not Implemented
GT0350 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,300 $9,000 Implemented