IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,349

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0345 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,195 $16,220 Implemented
IA0345 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,206 $2,062 Implemented
IA0345 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,085 $568 Implemented
IA0345 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,305 $2,330 Implemented
IA0345 # 09 Y:2004 09 2004 UPGRADE CONVEYORS $1,225 $2,145 Implemented
IA0345 # 10 Y:2004 10 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,689 $1,828 Implemented
IA0345 # 11 Y:2004 11 2004 COVER OPEN TANKS $12,884 $22,000 Implemented
IA0345 # 12 Y:2004 12 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,035 $20,180 Implemented
IA0345 # 13 Y:2004 13 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $30,870 $10,000 Implemented
IA0345 # 15 Y:2004 15 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,290 $1,035 Implemented
IA0345 # 16 Y:2004 16 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,290 $1,100 Implemented
IA0345 # 17 Y:2004 17 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,145 $399 Implemented
IA0343 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,846 $446 Implemented
IA0343 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125 $70 Implemented
IA0343 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,173 $7,306 Implemented
IA0343 # 07 Y:2004 07 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,733 $10,000 Implemented
IA0342 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $344 Implemented
IA0342 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,094 $888 Implemented
IA0342 # 04 Y:2004 04 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,701 $1,500 Implemented
IA0342 # 06 Y:2004 06 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $7,150 $715 Implemented
IA0341 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,502 $700 Implemented
IA0341 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,519 $460 Implemented
IA0341 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $105 Implemented
IA0341 # 05 Y:2004 05 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,040 $54,300 Implemented
IA0341 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $194 Implemented