IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0566 # 06 Y:2016 06 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,284 $1,000 Implemented
IA0566 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,966 $195 Implemented
IA0566 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,660 $6,945 Implemented
IA0566 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $3,889 $5,100 Implemented
IA0566 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,279 $6,724 Implemented
IA0566 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,976 $49,834 Implemented
IA0566 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $592 $70 Implemented
IA0552 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,216 $390 Implemented
IA0552 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $886 $357 Implemented
IA0552 # 04 Y:2016 04 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,573 $1 Implemented
IA0552 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $4,046 $2,600 Implemented
IA0552 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,982 $104,231 Implemented
IA0520 # 01 Y:2014 01 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,603 $2,179 Implemented
IA0520 # 06 Y:2014 06 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $429 $253 Implemented
IA0520 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $392 Implemented
IA0520 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,486 $234 Implemented
IA0518 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,803 $2,302 Implemented
IA0518 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,232 $5,280 Implemented
IA0518 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,434 $704 Implemented
IA0518 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $939 $185 Implemented
IA0518 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $149 $210 Implemented
IA0518 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,190 $8,793 Implemented
IA0518 # 08 Y:2014 08 2014 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $462 $80 Implemented
IA0505 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,467 $845 Implemented
IA0505 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $319 $100 Implemented