IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,660

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0364 # 12 Y:2005 12 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,870 $1,000 Not Implemented
IA0364 # 13 Y:2005 13 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $31,486 $50,000 Not Implemented
IA0364 # 14 Y:2005 14 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $106,060 $8,250 Not Implemented
IA0365 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,317 $50 Implemented
IA0365 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $19 Implemented
IA0365 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,995 $3,000 Implemented
IA0365 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $1,148 $1,001 Not Implemented
IA0365 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $628 $1,600 Implemented
IA0365 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $1,000,000 $152,672 Implemented
IA0365 # 07 Y:2005 07 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,495 $14,000 Not Implemented
IA0365 # 08 Y:2005 08 2005 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $21,000 $7,216 Implemented
IA0363 # 01 Y:2005 01 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,128 $1,344 Not Implemented
IA0363 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,682 $12,835 Not Implemented
IA0363 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,962 $1,023 Implemented
IA0363 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,383 $15,627 Implemented
IA0363 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $2,171 Not Implemented
IA0363 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $20,328 $0 Implemented
IA0363 # 07 Y:2005 07 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,742 $95 Not Implemented
IA0363 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $859 $1,617 Not Implemented
IA0362 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $385 $30 Not Implemented
IA0362 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,270 $1,000 Implemented
IA0362 # 03 Y:2005 03 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $845 $207 Not Implemented
IA0362 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,552 $3,000 Implemented
IA0362 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $429 $502 Implemented
IA0362 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $511 $1,309 Not Implemented