IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,660

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0343 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125 $70 Implemented
IA0343 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,173 $7,306 Implemented
IA0343 # 05 Y:2004 05 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $817 $1,230 Not Implemented
IA0343 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,859 $9,696 Not Implemented
IA0343 # 07 Y:2004 07 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,733 $10,000 Implemented
IA0342 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $775 $344 Implemented
IA0342 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,335 $31,871 Not Implemented
IA0342 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,094 $888 Implemented
IA0342 # 04 Y:2004 04 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,701 $1,500 Implemented
IA0342 # 05 Y:2004 05 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,625 $538 Not Implemented
IA0342 # 06 Y:2004 06 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $7,150 $715 Implemented
IA0341 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,506 $1,200 Not Implemented
IA0341 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,502 $700 Implemented
IA0341 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,519 $460 Implemented
IA0341 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $105 Implemented
IA0341 # 05 Y:2004 05 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,040 $54,300 Implemented
IA0341 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $194 Implemented
IA0341 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $1,990 Implemented
IA0341 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $123 $289 Implemented
IA0340 # 01 Y:2004 01 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,674 $2,382 Not Implemented
IA0340 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,101 $1,000 Implemented
IA0340 # 03 Y:2004 03 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $18,750 $4,940 Implemented
IA0340 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $343 $263 Not Implemented
IA0340 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $686 $962 Implemented
IA0340 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,946 $135 Implemented