Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,660
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0343 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $125 | $70 | Implemented |
IA0343 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,173 | $7,306 | Implemented |
IA0343 # 05 Y:2004 | 05 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $817 | $1,230 | Not Implemented |
IA0343 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,859 | $9,696 | Not Implemented |
IA0343 # 07 Y:2004 | 07 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $39,733 | $10,000 | Implemented |
IA0342 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $775 | $344 | Implemented |
IA0342 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,335 | $31,871 | Not Implemented |
IA0342 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $1,094 | $888 | Implemented |
IA0342 # 04 Y:2004 | 04 | 2004 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,701 | $1,500 | Implemented |
IA0342 # 05 Y:2004 | 05 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,625 | $538 | Not Implemented |
IA0342 # 06 Y:2004 | 06 | 2004 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $7,150 | $715 | Implemented |
IA0341 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $7,506 | $1,200 | Not Implemented |
IA0341 # 02 Y:2004 | 02 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,502 | $700 | Implemented |
IA0341 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,519 | $460 | Implemented |
IA0341 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $727 | $105 | Implemented |
IA0341 # 05 Y:2004 | 05 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,040 | $54,300 | Implemented |
IA0341 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $182 | $194 | Implemented |
IA0341 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $874 | $1,990 | Implemented |
IA0341 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $123 | $289 | Implemented |
IA0340 # 01 Y:2004 | 01 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,674 | $2,382 | Not Implemented |
IA0340 # 02 Y:2004 | 02 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,101 | $1,000 | Implemented |
IA0340 # 03 Y:2004 | 03 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $18,750 | $4,940 | Implemented |
IA0340 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $343 | $263 | Not Implemented |
IA0340 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $686 | $962 | Implemented |
IA0340 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,946 | $135 | Implemented |