IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,344

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0388 # 08 Y:1992 08 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $182 $480 Implemented
KU0388 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $172 $0 Implemented
KU0388 # 10 Y:1992 10 1992 INSTALL SET-BACK TIMERS $515 $900 Implemented
KU0389 # 01 Y:1992 01 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $12,201 $0 Implemented
KU0389 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $1,546 $1,000 Implemented
KU0389 # 04 Y:1992 04 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,964 $2,250 Implemented
KU0390 # 04 Y:1992 04 1992 BURN A LESS EXPENSIVE GRADE OF FUEL $4,504 $0 Implemented
KU0390 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,643 $3,800 Implemented
KU0390 # 11 Y:1992 11 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,839 $420 Implemented
KU0390 # 12 Y:1992 12 1992 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $1,696 $1,250 Implemented
KU0383 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,849 $0 Implemented
KU0383 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $275 $80 Implemented
KU0383 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,816 $2,607 Implemented
KU0383 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $412 $200 Implemented
KU0384 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,255 $100 Implemented
KU0384 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,309 $2,000 Implemented
KU0384 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55 $0 Implemented
KU0384 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $477 $600 Implemented
KU0385 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,028 $4,050 Implemented
KU0385 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,119 $1,080 Implemented
KU0385 # 03 Y:1992 03 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $440 $30 Implemented
KU0385 # 06 Y:1992 06 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,786 $2,365 Implemented
KU0386 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,585 $25,288 Implemented
KU0386 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,093 $6,720 Implemented
KU0386 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,155 $0 Implemented