IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,344

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0510 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,670 $900 Implemented
KU0510 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $350 $1,000 Implemented
KU0510 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $400 Implemented
KU0510 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,350 $2,310 Implemented
KU0509 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,070 $0 Implemented
KU0509 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $640 $380 Implemented
KU0509 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,630 $1,170 Implemented
KU0509 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,350 $30 Implemented
KU0508 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,850 $5,030 Implemented
KU0508 # 02 Y:1998 02 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,900 $7,180 Implemented
KU0508 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $470 $350 Implemented
KU0508 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $100 Implemented
KU0508 # 06 Y:1998 06 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $200,430 $152,790 Implemented
KU0507 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,100 $9,690 Implemented
KU0507 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $900 $1,190 Implemented
KU0507 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $520 $890 Implemented
KU0507 # 07 Y:1998 07 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $22,350 $790 Implemented
KU0505 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $9,600 Implemented
KU0505 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,350 $20 Implemented
KU0505 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $400 Implemented
KU0505 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $720 $340 Implemented
KU0505 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $510 $260 Implemented
KU0505 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $800 $0 Implemented
KU0505 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $75,000 $193,000 Implemented
KU0505 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $25,940 $2,560 Implemented