IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

700

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0554 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,829 $0 Implemented
KU0554 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,445 $0 Implemented
KU0549 # 02 Y:2000 02 2000 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $2,132 $3,172 Implemented
KU0544 # 01 Y:2000 01 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,310 $800 Implemented
KU0544 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,390 $840 Implemented
KU0544 # 05 Y:2000 05 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $31,200 $2,780 Implemented
KU0539 # 03 Y:2000 03 2000 USE OPTIMUM TEMPERATURE $15,700 $20,000 Implemented
KU0535 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $900 Implemented
KU0535 # 02 Y:1999 02 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,250 $2,640 Implemented
KU0535 # 03 Y:1999 03 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,870 $1,250 Implemented
KU0529 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $700 Implemented
KU0529 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $930 Implemented
KU0529 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,840 $840 Implemented
KU0493 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,340 $9,530 Implemented
KU0493 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $540 Implemented
KU0493 # 05 Y:1998 05 1998 ISOLATE HOT OR COLD EQUIPMENT $1,310 $1,000 Implemented
KU0493 # 01 Y:1998 01 1998 USE OPTIMUM TEMPERATURE $28,340 $3,500 Implemented
KU0493 # 11 Y:1998 11 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $580 $1,050 Implemented
KU0493 # 07 Y:1998 07 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $600 $1,000 Implemented
KU0493 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,290 $4,940 Implemented
KU0492 # 09 Y:1998 09 1998 PURCHASE EQUIPMENT INSTEAD OF LEASING $4,200 $12,000 Implemented
KU0492 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,750 $700 Implemented
KU0492 # 08 Y:1998 08 1998 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $1,510 $940 Implemented
KU0492 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $400 $1,000 Implemented
KU0491 # 09 Y:1998 09 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,560 $0 Implemented