Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
213
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0546 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $870 | $740 | Implemented |
KU0546 # 04 Y:2000 | 04 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,500 | $1,000 | Implemented |
KU0543 # 05 Y:2000 | 05 | 2000 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $420 | $100 | Implemented |
KU0543 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $430 | $50 | Implemented |
KU0543 # 01 Y:2000 | 01 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $27,200 | $0 | Implemented |
KU0527 # 06 Y:1999 | 06 | 1999 | AUTOMATE FINISHING PROCESS | $56,160 | $92,600 | Implemented |
KU0527 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $290 | $80 | Implemented |
KU0527 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $540 | $490 | Implemented |
KU0527 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,050 | $80 | Implemented |
KU0511 # 13 Y:1998 | 13 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $4,980 | $10,000 | Implemented |
KU0511 # 12 Y:1998 | 12 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,560 | $690 | Implemented |
KU0511 # 10 Y:1998 | 10 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,070 | $17,000 | Implemented |
KU0511 # 08 Y:1998 | 08 | 1998 | INSULATE BARE EQUIPMENT | $230 | $680 | Implemented |
KU0511 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $590 | $360 | Implemented |
KU0511 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,670 | $3,960 | Implemented |
KU0511 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,560 | $800 | Implemented |
KU0511 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,570 | $2,550 | Implemented |
KU0511 # 03 Y:1998 | 03 | 1998 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,080 | $3,040 | Implemented |
KU0511 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,680 | $19,610 | Implemented |
KU0510 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,400 | $4,710 | Implemented |
KU0510 # 01 Y:1998 | 01 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,740 | $200 | Implemented |
KU0510 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,670 | $900 | Implemented |
KU0510 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $400 | Implemented |
KU0510 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,350 | $2,310 | Implemented |
KU0510 # 04 Y:1998 | 04 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $350 | $1,000 | Implemented |