IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0323 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $201 $120 Implemented
KU0324 # 01 Y:1990 01 1990 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,876 $410 Not Implemented
KU0324 # 02 Y:1990 02 1990 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,759 $4,000 Implemented
KU0324 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $544 $0 Implemented
KU0324 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $821 $600 Not Implemented
KU0325 # 01 Y:1990 01 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,128 $20,800 Not Implemented
KU0325 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,200 $3,078 Implemented
KU0325 # 03 Y:1990 03 1990 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $391 $466 Implemented
KU0325 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,788 $2,802 Not Implemented
KU0325 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $1,416 Implemented
KU0325 # 06 Y:1990 06 1990 REDUCE VENTILATION AIR $8,297 $11,700 Implemented
KU0325 # 07 Y:1990 07 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $50,733 $0 Implemented
KU0319 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $604 $400 Implemented
KU0316 # 03 Y:1990 03 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,122 $15,000 Implemented
KU0319 # 02 Y:1990 02 1990 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $6,698 $1,200 Implemented
KU0319 # 01 Y:1990 01 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,684 $2,597 Not Implemented
KU0318 # 07 Y:1990 07 1990 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $1,283 $3,200 Not Implemented
KU0318 # 06 Y:1990 06 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $61,404 $0 Implemented
KU0318 # 05 Y:1990 05 1990 RECOVER AND REUSE COOLING WATER $65,074 $27,000 Not Implemented
KU0318 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74 $90 Implemented
KU0318 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $741 Implemented
KU0318 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,872 $1,000 Implemented
KU0316 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $2,160 $2,250 Implemented
KU0316 # 07 Y:1990 07 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $117 $0 Not Implemented
KU0316 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,034 $1,000 Implemented