Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0527 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $32,527 | $500,000 | Implemented |
LE0527 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,621 | $1,330 | Implemented |
LE0527 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $103 | $40 | Not Implemented |
LE0527 # 01 Y:2022 | 01 | 2022 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,805 | $0 | Implemented |
LE0526 # 01 Y:2022 | 01 | 2022 | PAY UTILITY BILLS ON TIME | $671 | $0 | Implemented |
LE0526 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,267 | $1,927 | Implemented |
LE0526 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,461 | $2,205 | Implemented |
LE0526 # 04 Y:2022 | 04 | 2022 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,817 | $1,200 | Not Implemented |
LE0526 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,717 | $1,900 | Implemented |
LE0526 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $728 | $1,800 | Not Implemented |
LE0526 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,661 | $48,235 | Implemented |
LE0526 # 09 Y:2022 | 09 | 2022 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $37,269 | $125,000 | Not Implemented |
LE0526 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,615 | $3,540 | Implemented |
LE0522 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,261 | $2,600 | Not Implemented |
LE0522 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $335 | $35 | Not Implemented |
LE0522 # 02 Y:2022 | 02 | 2022 | KEEP EQUIPMENT CLEAN | $1,947 | $1,161 | Not Implemented |
LE0522 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,971 | $1,200 | Not Implemented |
LE0522 # 05 Y:2022 | 05 | 2022 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,028 | $7,400 | Not Implemented |
LE0522 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,085 | $4,448 | Not Implemented |
LE0522 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,680 | $12,720 | Not Implemented |
LE0518 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,198 | $2,600 | Implemented |
LE0518 # 06 Y:2022 | 06 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $114,025 | $450,000 | Not Implemented |
LE0518 # 05 Y:2022 | 05 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $45,859 | $175,000 | Implemented |
LE0518 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,077 | $30,000 | Implemented |
LE0518 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,790 | $8,800 | Implemented |