IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,743

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0370 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,076 $1,000 Implemented
LE0370 # 05 Y:2014 05 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,981 $2,653 Implemented
LE0370 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,997 $4,187 Not Implemented
LE0370 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,755 $1,688 Not Implemented
LE0370 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,133 $15,100 Not Implemented
LE0370 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,137 $6,750 Not Implemented
LE0370 # 10 Y:2014 10 2014 REPLACE BOILER $61,996 $205,000 Not Implemented
LE0370 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,070 $75,880 Not Implemented
LE0368 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,192 $1,280 Not Implemented
LE0368 # 02 Y:2013 02 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $10,077 $800 Not Implemented
LE0368 # 03 Y:2013 03 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $15,354 $800 Not Implemented
LE0368 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $72 $72 Not Implemented
LE0368 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,200 $1,000 Not Implemented
LE0368 # 06 Y:2013 06 2013 INSTALL TIMERS AND/OR THERMOSTATS $4,569 $4,320 Not Implemented
LE0368 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $618 $500 Not Implemented
LE0368 # 08 Y:2013 08 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $688 $1,200 Not Implemented
LE0368 # 09 Y:2013 09 2013 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $12,354 $0 Not Implemented
LE0368 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,761 $61,150 Not Implemented
LE0368 # 11 Y:2013 11 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,665 $16,200 Not Implemented
LE0368 # 12 Y:2013 12 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,154 $64,400 Not Implemented
LE0368 # 13 Y:2013 13 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,829 $2,000 Not Implemented
LE0369 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $8,050 $19,339 Implemented
LE0369 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $14,365 Implemented
LE0369 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,867 $8,710 Not Implemented
LE0369 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,258 $7,350 Implemented