Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
192
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0213 # 08 Y:2004 | 08 | 2004 | INSULATE BARE EQUIPMENT | $1,146 | $492 | Implemented |
LL0213 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,862 | $6,160 | Implemented |
LL0213 # 09 Y:2004 | 09 | 2004 | $67,520 | $4,000 | Implemented | |
LL0213 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $479,962 | $1,400,000 | Implemented |
LL0213 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,028 | $1,485 | Implemented |
LL0213 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,231 | $4,806 | Implemented |
LL0207 # 01 Y:2004 | 01 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $36,769 | $16,000 | Implemented |
LL0207 # 05 Y:2004 | 05 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $2,149 | $1,960 | Implemented |
LL0207 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $34,833 | $7,488 | Implemented |
LL0207 # 10 Y:2004 | 10 | 2004 | $46,500 | $3,150 | Implemented | |
LL0212 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,806 | $30 | Implemented |
LL0212 # 06 Y:2004 | 06 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $834 | $264 | Implemented |
LL0212 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,474 | $4,400 | Implemented |
LL0212 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $613 | $990 | Implemented |
LL0212 # 07 Y:2004 | 07 | 2004 | USE PHOTOCELL CONTROLS | $821 | $120 | Implemented |
LL0212 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,438 | $15,562 | Implemented |
LL0212 # 01 Y:2004 | 01 | 2004 | USE PHOTOCELL CONTROLS | $28,293 | $1,638 | Implemented |
LL0211 # 01 Y:2004 | 01 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,929 | $825 | Implemented |
LL0211 # 08 Y:2004 | 08 | 2004 | USE PHOTOCELL CONTROLS | $170 | $270 | Implemented |
LL0211 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $261 | $30 | Implemented |
LL0211 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $754 | $1,120 | Implemented |
LL0211 # 03 Y:2004 | 03 | 2004 | USE PHOTOCELL CONTROLS | $899 | $30 | Implemented |
LL0211 # 02 Y:2004 | 02 | 2004 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,415 | $895 | Implemented |
LL0210 # 03 Y:2004 | 03 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $5,147 | $1,528 | Implemented |
LL0210 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,408 | $9,920 | Implemented |