Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
936
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0060 # 13 Y:2003 | 13 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,200 | $75 | Not Implemented |
LM0060 # 14 Y:2003 | 14 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,800 | $20,000 | Implemented |
LM0060 # 15 Y:2003 | 15 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $112,500 | $8,120 | Implemented |
LM0056 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,587 | $690 | Implemented |
LM0056 # 02 Y:2003 | 02 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $7,713 | $0 | Implemented |
LM0056 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,371 | $1,200 | Not Implemented |
LM0056 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $300,000 | $5,000 | Not Implemented |
LM0056 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $450,000 | $20,000 | n/a |
LM0056 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,754 | $1,968 | Not Implemented |
LM0056 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,330 | $6,675 | Not Implemented |
LM0056 # 08 Y:2003 | 08 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $35,000 | $28,714 | n/a |
LM0056 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $3,504 | $1,726 | Not Implemented |
LM0056 # 10 Y:2003 | 10 | 2003 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $356 | $0 | Not Implemented |
LM0059 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $634 | $310 | Not Implemented |
LM0059 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $298 | $120 | Implemented |
LM0059 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $402 | $150 | Not Implemented |
LM0059 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $245 | $145 | Not Implemented |
LM0059 # 05 Y:2003 | 05 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,308 | $5,000 | Not Implemented |
LM0059 # 06 Y:2003 | 06 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,238 | $11,000 | Not Implemented |
LM0059 # 07 Y:2003 | 07 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,160,984 | $1,000,000 | Not Implemented |
LM0059 # 08 Y:2003 | 08 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $17,902 | $10,000 | Implemented |
LM0059 # 09 Y:2003 | 09 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,518,000 | $250,000 | Not Implemented |
LM0058 # 01 Y:2003 | 01 | 2003 | ADD AREA LIGHTING SWITCHES | $6,786 | $7,274 | Implemented |
LM0058 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,174 | $250 | Implemented |
LM0058 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,012 | $18,500 | Not Implemented |