IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

936

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0091 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,029 $683 Implemented
LM0091 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $764 $240 Implemented
LM0091 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,000 $1,260 Not Implemented
LM0091 # 05 Y:2005 05 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,750 $200 Implemented
LM0091 # 06 Y:2005 06 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $16,875 $2,150 Implemented
LM0091 # 07 Y:2005 07 2005 MOVE PRODUCT USING MECHANICAL MEANS $16,875 $1,600 Implemented
LM0090 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,633 $0 Not Implemented
LM0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $429 $280 Implemented
LM0090 # 03 Y:2005 03 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,100 $0 Not Implemented
LM0090 # 04 Y:2005 04 2005 DEVELOP STANDARD OPERATING PROCEDURES $2,898 $2,000 Not Implemented
LM0090 # 05 Y:2005 05 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $45,000 $32,440 Not Implemented
LM0090 # 06 Y:2005 06 2005 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $24,485 $2,000 Not Implemented
LM0090 # 07 Y:2005 07 2005 INSTALL SKYLIGHTS $2,790 $7,500 Not Implemented
LM0089 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $380 Implemented
LM0089 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $163 $0 Not Implemented
LM0089 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,655 $4,550 Not Implemented
LM0089 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $368 $150 Not Implemented
LM0089 # 05 Y:2005 05 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $26,400 $0 Implemented
LM0089 # 06 Y:2005 06 2005 MODIFY MATERIAL APPLICATION METHODS $7,090 $800 Implemented
LM0088 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,003 $300 Not Implemented
LM0088 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $991 $250 Not Implemented
LM0088 # 03 Y:2005 03 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $7,975 $3,000 Implemented
LM0088 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,349 $0 Not Implemented
LM0088 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82 $126 Not Implemented
LM0087 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,069 $17,418 Implemented