IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0020 # 07 Y:2001 07 2001 MODIFY WORKLOAD $12,653 $1,199 Not Implemented
LM0020 # 06 Y:2001 06 2001 MODIFY WORKLOAD $201,115 $1,000 Implemented
LM0020 # 05 Y:2001 05 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,575 $300 Implemented
LM0020 # 04 Y:2001 04 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,792 $11,800 Not Implemented
LM0020 # 03 Y:2001 03 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $81,101 $150,000 Not Implemented
LM0020 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,709 $0 Implemented
LM0020 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,625 $869 Not Implemented
LM0019 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $425 $418 Not Implemented
LM0019 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,586 $240 Not Implemented
LM0019 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $2,482 Not Implemented
LM0019 # 04 Y:2001 04 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,087 $450 Implemented
LM0019 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $10,000 $3,000 Implemented
LM0021 # 07 Y:2001 07 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $203,861 $40,400 Not Implemented
LM0021 # 06 Y:2001 06 2001 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $12,450 $250 Not Implemented
LM0021 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,216 $228 Not Implemented
LM0021 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,054 $400 Implemented
LM0021 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,649 $6,000 Implemented
LM0021 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,680 $48,707 Implemented
LM0021 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,082 $857 Implemented
LM0018 # 05 Y:2001 05 2001 DEVELOP STANDARD OPERATING PROCEDURES $30,900 $8,000 Not Implemented
LM0018 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,174 $500 Not Implemented
LM0018 # 03 Y:2001 03 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,910 $11,800 Not Implemented
LM0018 # 01 Y:2001 01 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,902 $8,000 Not Implemented
LM0018 # 04 Y:2001 04 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,800 $2,250 Implemented
LM0018 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $724 $350 Implemented