Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
149
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0020 # 07 Y:2001 | 07 | 2001 | MODIFY WORKLOAD | $12,653 | $1,199 | Not Implemented |
LM0020 # 06 Y:2001 | 06 | 2001 | MODIFY WORKLOAD | $201,115 | $1,000 | Implemented |
LM0020 # 05 Y:2001 | 05 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,575 | $300 | Implemented |
LM0020 # 04 Y:2001 | 04 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,792 | $11,800 | Not Implemented |
LM0020 # 03 Y:2001 | 03 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $81,101 | $150,000 | Not Implemented |
LM0020 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,709 | $0 | Implemented |
LM0020 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,625 | $869 | Not Implemented |
LM0019 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $425 | $418 | Not Implemented |
LM0019 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,586 | $240 | Not Implemented |
LM0019 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,085 | $2,482 | Not Implemented |
LM0019 # 04 Y:2001 | 04 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,087 | $450 | Implemented |
LM0019 # 05 Y:2001 | 05 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $10,000 | $3,000 | Implemented |
LM0021 # 07 Y:2001 | 07 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $203,861 | $40,400 | Not Implemented |
LM0021 # 06 Y:2001 | 06 | 2001 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $12,450 | $250 | Not Implemented |
LM0021 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,216 | $228 | Not Implemented |
LM0021 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,054 | $400 | Implemented |
LM0021 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,649 | $6,000 | Implemented |
LM0021 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,680 | $48,707 | Implemented |
LM0021 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,082 | $857 | Implemented |
LM0018 # 05 Y:2001 | 05 | 2001 | DEVELOP STANDARD OPERATING PROCEDURES | $30,900 | $8,000 | Not Implemented |
LM0018 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,174 | $500 | Not Implemented |
LM0018 # 03 Y:2001 | 03 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,910 | $11,800 | Not Implemented |
LM0018 # 01 Y:2001 | 01 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,902 | $8,000 | Not Implemented |
LM0018 # 04 Y:2001 | 04 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $7,800 | $2,250 | Implemented |
LM0018 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $724 | $350 | Implemented |