IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,766

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0509 # 02 Y:2002 02 2002 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $18,790 $45,905 Implemented
MA0509 # 03 Y:2002 03 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,396 $0 Implemented
MA0509 # 04 Y:2002 04 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,396 $4,200 Implemented
MA0509 # 05 Y:2002 05 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,790 $1,200 Implemented
MA0509 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $439 $1,600 Implemented
MA0508 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $29,135 $0 Implemented
MA0508 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,830 $5,950 Implemented
MA0508 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,878 $3,513 Implemented
MA0508 # 04 Y:2002 04 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,108 $400 Implemented
MA0508 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,586 $0 Implemented
MA0507 # 01 Y:2002 01 2002 ADOPT IN-HOUSE MATERIAL GENERATION $69,744 $194,100 Implemented
MA0507 # 05 Y:2002 05 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $795 $3,230 Implemented
MA0507 # 06 Y:2002 06 2002 PAY BILLS ON TIME TO AVOID LATE FEES $576 $0 Implemented
MA0507 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $213 $0 Implemented
MA0504 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,658 $80,500 Implemented
MA0504 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $24,477 $22,000 Implemented
MA0504 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,901 $7,000 Implemented
MA0504 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,196 $0 Implemented
MA0503 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $508 $300 Implemented
MA0503 # 09 Y:2001 09 2001 INSULATE BARE EQUIPMENT $457 $500 Implemented
MA0501 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,983 $6,000 Implemented
MA0501 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,653 $46,540 Implemented
MA0501 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $5,838 $9,990 Implemented
MA0501 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $4,410 $2,500 Implemented
MA0501 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $736 $300 Implemented