IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0290 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $110 Implemented
MA0290 # 02 Y:1993 02 1993 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $6,283 $6,250 Implemented
MA0290 # 03 Y:1993 03 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,851 $1,190 Implemented
MA0290 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,146 $3,034 Implemented
MA0290 # 01 Y:1993 01 1993 RECOVER AND REUSE COOLING WATER $12,463 $15,645 Implemented
MA0289 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,948 $180 Implemented
MA0289 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,282 $20,878 Implemented
MA0289 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $67 Implemented
MA0288 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,263 $0 Implemented
MA0285 # 03 Y:1993 03 1993 REPLACE BOILER $26,214 $0 Implemented
MA0287 # 06 Y:1993 06 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,040 $4,230 Implemented
MA0287 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,949 $29,400 Implemented
MA0287 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,205 $0 Implemented
MA0287 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $1,406 $1,408 Implemented
MA0284 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $158 $0 Implemented
MA0284 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $689 $685 Implemented
MA0283 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $371 $400 Implemented
MA0283 # 03 Y:1993 03 1993 RECOVER AND REUSE COOLING WATER $1,407 $200 Implemented
MA0283 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $548 $151 Implemented
MA0283 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,380 $6,000 Implemented
MA0283 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,690 $435 Implemented
MA0282 # 06 Y:1993 06 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $475 $0 Implemented
MA0282 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,625 $2,854 Implemented
MA0282 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,828 $23,220 Implemented
MA0282 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $6,041 $1,622 Implemented