IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0485 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,800 $0 Implemented
MA0485 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $2,300 $10,000 Implemented
MA0485 # 08 Y:2001 08 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,000 $0 Implemented
MA0485 # 09 Y:2001 09 2001 INSULATE FEEDWATER TANK $800 $2,000 Implemented
MA0482 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,400 $93,000 Not Implemented
MA0482 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $15,900 $13,000 Not Implemented
MA0482 # 03 Y:2001 03 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,590 $30,000 Not Implemented
MA0482 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,900 $23,000 Not Implemented
MA0482 # 05 Y:2001 05 2001 USE RADIANT HEATER FOR SPOT HEATING $5,430 $25,000 Not Implemented
MA0482 # 06 Y:2001 06 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,200 $13,000 Not Implemented
MA0482 # 07 Y:2001 07 2001 RECYCLE WHITE WATER $5,000 $20,000 Not Implemented
MA0482 # 08 Y:2001 08 2001 METER WASTE WATER $4,400 $12,000 Not Implemented
MA0482 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $450 Implemented
MA0482 # 10 Y:2001 10 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,700 $5,000 Not Implemented
MA0482 # 11 Y:2001 11 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $7,000 Not Implemented
MA0482 # 12 Y:2001 12 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,000 $600 Not Implemented
MA0479 # 01 Y:2000 01 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,300 $3,000 Implemented
MA0479 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,900 $8,400 Implemented
MA0479 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,310 $550 Implemented
MA0479 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,760 $5,800 Not Implemented
MA0479 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $0 Implemented
MA0479 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $750 $1,250 Implemented
MA0479 # 07 Y:2000 07 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $320 $1,400 Not Implemented
MA0481 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,820 $30,000 Implemented
MA0481 # 02 Y:2001 02 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,390 $5,500 Implemented