IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0394 # 06 Y:1997 06 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,120 $0 Not Implemented
MA0393 # 01 Y:1997 01 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $92,750 $68,000 Implemented
MA0393 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $8,750 $1,000 Implemented
MA0393 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $2,550 $356 Implemented
MA0393 # 04 Y:1997 04 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,895 $10 Implemented
MA0393 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $160 $0 Implemented
MA0393 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $147 $0 Implemented
MA0392 # 01 Y:1997 01 1997 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $34,500 $21,950 Implemented
MA0392 # 02 Y:1997 02 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,500 $3,000 Not Implemented
MA0392 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,388 $6,000 Not Implemented
MA0392 # 04 Y:1997 04 1997 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $320 $268 Implemented
MA0392 # 05 Y:1997 05 1997 CONVERT TO AQUEOUS CLEANING $276 $759 Implemented
MA0388 # 01 Y:1997 01 1997 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $95,807 $47,527 Implemented
MA0388 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,382 $1,100 Not Implemented
MA0388 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,884 $4,925 Implemented
MA0388 # 04 Y:1997 04 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $7,561 $18,983 Not Implemented
MA0388 # 05 Y:1997 05 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,406 $858 Not Implemented
MA0388 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $604 $272 Implemented
MA0388 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,002 $0 Implemented
MA0388 # 08 Y:1997 08 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $32,204 $55,094 Implemented
MA0390 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,319 $11,700 Not Implemented
MA0390 # 02 Y:1997 02 1997 PAY BILLS ON TIME TO AVOID LATE FEES $5,709 $0 Not Implemented
MA0390 # 03 Y:1997 03 1997 OPTIMIZE PLANT POWER FACTOR $4,435 $9,975 Not Implemented
MA0390 # 04 Y:1997 04 1997 CHECK FOR ACCURACY OF UTILITY / POWER METERS $3,585 $480 Not Implemented
MA0390 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $852 $999 Not Implemented