IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0363 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,549 $325 Implemented
MA0363 # 05 Y:1996 05 1996 UPGRADE OBSOLETE EQUIPMENT $1,801 $4,300 Not Implemented
MA0363 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $723 $700 Not Implemented
MA0363 # 07 Y:1996 07 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $410 $0 Implemented
MA0362 # 01 Y:1996 01 1996 USE EXISTING DAM TO GENERATE ELECTRICITY $109,702 $40,000 Implemented
MA0362 # 02 Y:1996 02 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $30,286 $11,000 Implemented
MA0362 # 03 Y:1996 03 1996 REPAIR OR REPLACE STEAM TRAPS $29,467 $6,350 Not Implemented
MA0362 # 04 Y:1996 04 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $18,658 $18,595 Implemented
MA0362 # 05 Y:1996 05 1996 PAY UTILITY BILLS ON TIME $10,690 $0 Not Implemented
MA0362 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,026 $14,436 Implemented
MA0362 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $1,613 $280 Not Implemented
MA0362 # 08 Y:1996 08 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $878 $902 Not Implemented
MA0361 # 02 Y:1996 02 1996 REPAIR OR REPLACE STEAM TRAPS $5,482 $3,408 Implemented
MA0361 # 03 Y:1996 03 1996 USE EVAPORATION TO CONCENTRATE MATERIAL $5,695 $295 Not Implemented
MA0361 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,759 $1,400 Implemented
MA0361 # 05 Y:1996 05 1996 INSTALL TIMERS AND/OR THERMOSTATS $5,189 $4,200 Implemented
MA0361 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $764 $2,493 Not Implemented
MA0361 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $432 $0 Implemented
MA0361 # 08 Y:1996 08 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $304 $79 Implemented
MA0361 # 01 Y:1996 01 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,187 $2,640 Implemented
MA0359 # 01 Y:1996 01 1996 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $9,520 $17,800 Not Implemented
MA0359 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,359 $13,344 Not Implemented
MA0359 # 03 Y:1996 03 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,436 $6,000 Not Implemented
MA0359 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $933 $1,440 Not Implemented
MA0359 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $830 $0 Not Implemented