IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0196 # 02 Y:1990 02 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $9,178 $2,409 Not Implemented
MA0196 # 03 Y:1990 03 1990 BURN WASTE OIL FOR HEAT $2,531 $559 Not Implemented
MA0196 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,856 $0 Not Implemented
MA0196 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,134 $2,460 Not Implemented
MA0196 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $65 $44 Not Implemented
MA0196 # 07 Y:1990 07 1990 USE OPTIMUM TEMPERATURE $4,435 $0 Not Implemented
MA0196 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $99 Not Implemented
MA0196 # 09 Y:1990 09 1990 INSTALL SET-BACK TIMERS $65 $65 Not Implemented
MA0197 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $406 $142 Implemented
MA0197 # 02 Y:1990 02 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,166 $642 Implemented
MA0197 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,726 $10,622 Implemented
MA0197 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $5,052 Implemented
MA0197 # 05 Y:1990 05 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $972 $0 Implemented
MA0197 # 06 Y:1990 06 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,680 $927 Implemented
MA0197 # 07 Y:1990 07 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,639 $19,720 Not Implemented
MA0198 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $15,618 $4,950 Not Implemented
MA0198 # 02 Y:1990 02 1990 REDUCE VENTILATION AIR $57,249 $22,320 Not Implemented
MA0198 # 03 Y:1990 03 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,747 $8,188 Not Implemented
MA0198 # 04 Y:1990 04 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,450 $102,564 Implemented
MA0198 # 05 Y:1990 05 1990 RECOVER AND REUSE COOLING WATER $5,754 $14,820 Not Implemented
MA0188 # 01 Y:1990 01 1990 AIR CONDITION ONLY SPACE NECESSARY $7,209 $7,000 Not Implemented
MA0188 # 02 Y:1990 02 1990 REPAIR OR REPLACE STEAM TRAPS $4,449 $1,600 Implemented
MA0188 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $6,213 $2,557 Implemented
MA0188 # 04 Y:1990 04 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,823 $185 Implemented
MA0188 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,378 $245 Implemented