IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0750 # 05 Y:2015 05 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $5,289 $2,500 Not Implemented
MA0750 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,138 $9,144 Not Implemented
MA0750 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $3,007 $1,500 Not Implemented
MA0750 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $537 $100 Not Implemented
MA0742 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $55,652 $120,000 Not Implemented
MA0742 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $38,357 $25,972 Implemented
MA0742 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24,583 $5,560 Implemented
MA0742 # 04 Y:2015 04 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,330 $1,000 Not Implemented
MA0742 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,116 $9,000 Implemented
MA0742 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,465 $11,685 Implemented
MA0742 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,112 $4,285 Not Implemented
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented
MA0741 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $131,224 $279,750 Not Implemented
MA0741 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $91,436 $5,000 Not Implemented
MA0741 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,787 $14,025 Not Implemented
MA0741 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,147 $29,732 Not Implemented
MA0741 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,279 $7,050 Not Implemented
MA0741 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,308 $2,775 Not Implemented
MA0727 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,693 $153,000 Not Implemented
MA0727 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,084 $127,730 Not Implemented
MA0727 # 03 Y:2014 03 2014 PAY UTILITY BILLS ON TIME $6,481 $500 Implemented
MA0727 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $2,761 $1,598 Not Implemented
MA0727 # 05 Y:2014 05 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,122 $1,500 Implemented
MA0725 # 01 Y:2014 01 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $1,049,475 $2,750,000 Implemented
MA0725 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $263,264 $594,880 Not Implemented