Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,929
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0603 # 14 Y:2006 | 14 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,402 | $0 | Implemented |
MA0603 # 15 Y:2006 | 15 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $874 | $4,000 | Implemented |
MA0603 # 16 Y:2006 | 16 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $650 | $4,000 | Implemented |
MA0603 # 17 Y:2006 | 17 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $172 | $0 | Implemented |
MA0602 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $79,413 | $172,300 | Not Implemented |
MA0602 # 02 Y:2006 | 02 | 2006 | USE MINIMUM SAFE OVEN VENTILATION | $71,115 | $115,075 | Not Implemented |
MA0602 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,335 | $96,992 | Implemented |
MA0602 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,691 | $749 | Implemented |
MA0602 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $8,388 | $4,050 | Implemented |
MA0602 # 06 Y:2006 | 06 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,526 | $8,755 | Not Implemented |
MA0602 # 07 Y:2006 | 07 | 2006 | OPTIMIZE PLANT POWER FACTOR | $1,918 | $700 | Not Implemented |
MA0602 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $1,122 | $950 | Implemented |
MA0601 # 02 Y:2006 | 02 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $71,974 | $10,118 | Not Implemented |
MA0601 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,368 | $24,444 | Implemented |
MA0601 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,148 | $18,975 | Implemented |
MA0601 # 05 Y:2006 | 05 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,090 | $2,300 | Not Implemented |
MA0601 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $147,022 | $129,390 | Implemented |
MA0599 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $89,422 | $172,300 | Not Implemented |
MA0599 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $20,495 | $3,700 | Not Implemented |
MA0599 # 03 Y:2006 | 03 | 2006 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $17,205 | $10,250 | Implemented |
MA0599 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $10,010 | $5,280 | Implemented |
MA0599 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,780 | $12,325 | Implemented |
MA0599 # 06 Y:2006 | 06 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,260 | $1,190 | Not Implemented |
MA0599 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,051 | $7,865 | Implemented |
MA0599 # 08 Y:2006 | 08 | 2006 | REDUCE FLUID FLOW RATES | $2,270 | $600 | Implemented |