IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0667 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $525 $550 Not Implemented
MA0667 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $98 $201 Not Implemented
MA0666 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,146 $5,990 Not Implemented
MA0666 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,085 $8,685 Not Implemented
MA0666 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $1,900 $500 Implemented
MA0666 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $550 $200 Not Implemented
MA0665 # 01 Y:2010 01 2010 UPGRADE CONTROLS ON COMPRESSORS $15,680 $58,600 Implemented
MA0665 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,642 $18,330 Implemented
MA0665 # 03 Y:2010 03 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,625 $2,000 Not Implemented
MA0665 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,470 $200 Implemented
MA0665 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,134 $3,150 Not Implemented
MA0665 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,028 $480 Implemented
MA0665 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $155 $180 Implemented
MA0664 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $133,570 $55,950 Implemented
MA0664 # 02 Y:2010 02 2010 MINIMIZE WATER USAGE $26,438 $62,000 Not Implemented
MA0664 # 03 Y:2010 03 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $25,051 $34,000 Not Implemented
MA0664 # 04 Y:2010 04 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,890 $95,000 Not Implemented
MA0664 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,874 $18,345 Not Implemented
MA0664 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,084 $200 Implemented
MA0663 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,896 $90,000 Not Implemented
MA0663 # 02 Y:2010 02 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,239 $24,000 Not Implemented
MA0663 # 03 Y:2010 03 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,990 $21,410 Not Implemented
MA0663 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $600 Implemented
MA0663 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $200 Not Implemented
MA0662 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,395 $2,265 Implemented