Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,929
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0482 # 05 Y:2001 | 05 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $5,430 | $25,000 | Not Implemented |
MA0482 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,200 | $13,000 | Not Implemented |
MA0482 # 07 Y:2001 | 07 | 2001 | RECYCLE WHITE WATER | $5,000 | $20,000 | Not Implemented |
MA0482 # 08 Y:2001 | 08 | 2001 | METER WASTE WATER | $4,400 | $12,000 | Not Implemented |
MA0482 # 09 Y:2001 | 09 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,040 | $450 | Implemented |
MA0482 # 10 Y:2001 | 10 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,700 | $5,000 | Not Implemented |
MA0482 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $7,000 | Not Implemented |
MA0482 # 12 Y:2001 | 12 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,000 | $600 | Not Implemented |
MA0481 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,820 | $30,000 | Implemented |
MA0481 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,390 | $5,500 | Implemented |
MA0481 # 03 Y:2001 | 03 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,380 | $4,800 | Not Implemented |
MA0481 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,370 | $7,000 | Implemented |
MA0481 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $1,315 | Implemented |
MA0481 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,400 | $10,000 | Not Implemented |
MA0481 # 07 Y:2001 | 07 | 2001 | INSULATE FEEDWATER TANK | $375 | $1,000 | Implemented |
MA0481 # 08 Y:2001 | 08 | 2001 | INSULATE FEEDWATER TANK | $260 | $1,300 | Not Implemented |
MA0477 # 01 Y:2000 | 01 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $22,890 | $2,000 | Not Implemented |
MA0477 # 02 Y:2000 | 02 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,290 | $103,000 | Not Implemented |
MA0477 # 03 Y:2000 | 03 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,580 | $21,000 | Not Implemented |
MA0477 # 04 Y:2000 | 04 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,910 | $0 | Not Implemented |
MA0477 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,200 | $11,700 | Implemented |
MA0477 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $410 | $500 | Implemented |
MA0476 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $109,000 | $720,000 | Not Implemented |
MA0476 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,750 | $50,000 | Not Implemented |
MA0476 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,100 | $24,000 | Implemented |