IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0412 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,686 $3,400 Implemented
MA0412 # 05 Y:1998 05 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $403 Implemented
MA0412 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $65,920 $385,000 Not Implemented
MA0412 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,050 $7,800 Not Implemented
MA0411 # 01 Y:1998 01 1998 RECOVER AND REUSE WASTE MATERIAL $171,700 $200,000 Not Implemented
MA0411 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,333 $225 Implemented
MA0411 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,128 $9,975 Not Implemented
MA0411 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $517 Not Implemented
MA0411 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $255 Not Implemented
MA0411 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $140 $140 Implemented
MA0403 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $57,769 $221,193 Not Implemented
MA0403 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,467 $41,542 Implemented
MA0403 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $7,904 $4,620 Implemented
MA0403 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,578 $19,800 Not Implemented
MA0403 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,118 $5,000 Not Implemented
MA0403 # 06 Y:1997 06 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $970 $900 Not Implemented
MA0403 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $0 Not Implemented
MA0402 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $217,449 $140,000 Not Implemented
MA0402 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $61,092 $16,597 Not Implemented
MA0402 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,628 $6,075 Not Implemented
MA0402 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,721 $4,925 Not Implemented
MA0402 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $2,577 $4,275 Not Implemented
MA0402 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $200 Not Implemented
MA0400 # 01 Y:1997 01 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $347,702 $505,000 Not Implemented
MA0400 # 02 Y:1997 02 1997 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $17,497 $92,676 Not Implemented