Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0638 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,761 | $0 | Implemented |
MA0638 # 08 Y:2008 | 08 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,670 | $3,000 | Implemented |
MA0638 # 09 Y:2008 | 09 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,488 | $2,450 | Not Implemented |
MA0638 # 10 Y:2008 | 10 | 2008 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,230 | $2,000 | Implemented |
MA0637 # 01 Y:2008 | 01 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $254,315 | $250,000 | Not Implemented |
MA0637 # 02 Y:2008 | 02 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $180,534 | $80,000 | Implemented |
MA0637 # 03 Y:2008 | 03 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $169,795 | $80,000 | Not Implemented |
MA0637 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $58,079 | $54,000 | Not Implemented |
MA0637 # 05 Y:2008 | 05 | 2008 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $29,950 | $27,000 | Not Implemented |
MA0637 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $24,017 | $14,000 | Implemented |
MA0637 # 07 Y:2008 | 07 | 2008 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $20,954 | $41,000 | Not Implemented |
MA0637 # 08 Y:2008 | 08 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,443 | $16,000 | Not Implemented |
MA0637 # 09 Y:2008 | 09 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,892 | $15,000 | Not Implemented |
MA0637 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,680 | $20,000 | Not Implemented |
MA0637 # 11 Y:2008 | 11 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,939 | $10,400 | Not Implemented |
MA0637 # 12 Y:2008 | 12 | 2008 | USE GRAVITY FEEDS WHEREVER POSSIBLE | $455 | $500 | Not Implemented |
MA0636 # 01 Y:2008 | 01 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $221,387 | $110,000 | Not Implemented |
MA0636 # 02 Y:2008 | 02 | 2008 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $147,853 | $540,000 | Not Implemented |
MA0636 # 03 Y:2008 | 03 | 2008 | USE EXISTING DAM TO GENERATE ELECTRICITY | $110,112 | $939,500 | Implemented |
MA0636 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,946 | $18,000 | Implemented |
MA0636 # 05 Y:2008 | 05 | 2008 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $8,663 | $5,000 | Not Implemented |
MA0636 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,272 | $0 | Not Implemented |
MA0636 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,142 | $20,000 | Not Implemented |
MA0633 # 01 Y:2008 | 01 | 2008 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $76,628 | $85,000 | Not Implemented |
MA0633 # 02 Y:2008 | 02 | 2008 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $8,944 | $25,000 | Not Implemented |