IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0638 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $0 Implemented
MA0638 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,670 $3,000 Implemented
MA0638 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,488 $2,450 Not Implemented
MA0638 # 10 Y:2008 10 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,230 $2,000 Implemented
MA0637 # 01 Y:2008 01 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $254,315 $250,000 Not Implemented
MA0637 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $180,534 $80,000 Implemented
MA0637 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $169,795 $80,000 Not Implemented
MA0637 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,079 $54,000 Not Implemented
MA0637 # 05 Y:2008 05 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $29,950 $27,000 Not Implemented
MA0637 # 06 Y:2008 06 2008 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $24,017 $14,000 Implemented
MA0637 # 07 Y:2008 07 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $20,954 $41,000 Not Implemented
MA0637 # 08 Y:2008 08 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,443 $16,000 Not Implemented
MA0637 # 09 Y:2008 09 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,892 $15,000 Not Implemented
MA0637 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,680 $20,000 Not Implemented
MA0637 # 11 Y:2008 11 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,939 $10,400 Not Implemented
MA0637 # 12 Y:2008 12 2008 USE GRAVITY FEEDS WHEREVER POSSIBLE $455 $500 Not Implemented
MA0636 # 01 Y:2008 01 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $221,387 $110,000 Not Implemented
MA0636 # 02 Y:2008 02 2008 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $147,853 $540,000 Not Implemented
MA0636 # 03 Y:2008 03 2008 USE EXISTING DAM TO GENERATE ELECTRICITY $110,112 $939,500 Implemented
MA0636 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,946 $18,000 Implemented
MA0636 # 05 Y:2008 05 2008 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $8,663 $5,000 Not Implemented
MA0636 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,272 $0 Not Implemented
MA0636 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,142 $20,000 Not Implemented
MA0633 # 01 Y:2008 01 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $76,628 $85,000 Not Implemented
MA0633 # 02 Y:2008 02 2008 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,944 $25,000 Not Implemented