Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0545 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $867 $340 Implemented
MA0545 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $601 $0 Implemented
MA0545 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $219 $0 Implemented
MA0545 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $199 $795 Implemented
MA0543 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,705 $21,900 n/a
MA0543 # 02 Y:2003 02 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $26,717 $40,000 Not Implemented
MA0543 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,265 $0 Not Implemented
MA0543 # 04 Y:2003 04 2003 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,292 $0 Not Implemented
MA0543 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,953 $12,400 Not Implemented
MA0543 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,571 $12,104 Implemented
MA0543 # 07 Y:2003 07 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,408 $527 Implemented
MA0542 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $14,636 $22,869 Not Implemented
MA0542 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,600 $21,400 Not Implemented
MA0542 # 03 Y:2003 03 2003 REDUCE VENTILATION AIR $9,202 $3,400 Not Implemented
MA0542 # 04 Y:2003 04 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $8,465 $0 Implemented
MA0542 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,383 $0 Implemented
MA0542 # 06 Y:2003 06 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,232 $500 Implemented
MA0542 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,659 $3,400 Not Implemented
MA0544 # 01 Y:2003 01 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,663 $2,000 Implemented
MA0544 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $2,425 $2,000 Not Implemented
MA0544 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,646 $6,156 Implemented
MA0544 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $1,236 $600 Not Implemented
MA0544 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $20 Implemented
MA0541 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $89,343 $700,000 n/a
MA0541 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,861 $46,350 Not Implemented