Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
152
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0524 # 07 Y:2002 | 07 | 2002 | INSULATE BARE EQUIPMENT | $179 | $750 | Implemented |
MA0524 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,117 | $2,000 | Implemented |
MA0524 # 01 Y:2002 | 01 | 2002 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $31,997 | $0 | Not Implemented |
MA0524 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,776 | $16,000 | n/a |
MA0524 # 04 Y:2002 | 04 | 2002 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,719 | $13,000 | n/a |
MA0524 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $501 | $158 | Implemented |
MA0524 # 02 Y:2002 | 02 | 2002 | ADOPT IN-HOUSE MATERIAL GENERATION | $14,755 | $45,000 | Not Implemented |
MA0525 # 06 Y:2002 | 06 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $101 | $0 | Implemented |
MA0525 # 01 Y:2002 | 01 | 2002 | AIR CONDITION ONLY SPACE NECESSARY | $10,201 | $800 | Implemented |
MA0525 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $582 | $200 | Implemented |
MA0525 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $791 | $0 | Implemented |
MA0525 # 05 Y:2002 | 05 | 2002 | INSULATE BARE EQUIPMENT | $425 | $596 | Implemented |
MA0525 # 02 Y:2002 | 02 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,687 | $5,159 | Not Implemented |
MA0525 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $80 | $300 | Not Implemented |
MA0522 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,884 | $20,000 | n/a |
MA0522 # 07 Y:2002 | 07 | 2002 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,709 | $1,000 | Implemented |
MA0522 # 05 Y:2002 | 05 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $19,687 | $55,000 | Not Implemented |
MA0522 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $161,660 | $225,500 | Not Implemented |
MA0522 # 03 Y:2002 | 03 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $59,990 | $26,000 | n/a |
MA0522 # 01 Y:2002 | 01 | 2002 | MINIMIZE WATER USAGE | $32,733 | $25,000 | n/a |
MA0522 # 09 Y:2002 | 09 | 2002 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $850,663 | $3,285,330 | Not Implemented |
MA0522 # 08 Y:2002 | 08 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,677 | $9,000 | Not Implemented |
MA0522 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,163 | $23,000 | Not Implemented |
MA0523 # 06 Y:2002 | 06 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $467 | $250 | Implemented |
MA0523 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $6,907 | $11,770 | Implemented |