IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0654 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $22,566 $39,500 Not Implemented
MA0654 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,377 $18,330 Implemented
MA0654 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,750 $30,000 Implemented
MA0654 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,876 $9,840 Not Implemented
MA0653 # 04 Y:2009 04 2009 CLOSE OFF UNNEEDED STEAM LINES $3,551 $500 Not Implemented
MA0653 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $16,188 $752 Implemented
MA0653 # 01 Y:2009 01 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $110,550 $270,000 Not Implemented
MA0653 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,375 $6,125 Not Implemented
MA0653 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,840 $7,510 Implemented
MA0653 # 02 Y:2009 02 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $37,210 $68,000 Not Implemented
MA0652 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $7,667 $0 Not Implemented
MA0652 # 02 Y:2009 02 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,132 $23,474 Implemented
MA0652 # 01 Y:2009 01 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $11,122 $1,990 Not Implemented
MA0652 # 04 Y:2009 04 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,585 $6,600 Not Implemented
MA0651 # 03 Y:2009 03 2009 REPLACE BOILER $10,080 $30,700 Implemented
MA0651 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,340 $96,800 Implemented
MA0651 # 04 Y:2009 04 2009 COVER OPEN TANKS $10,013 $5,866 Not Implemented
MA0651 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,941 $3,219 Not Implemented
MA0651 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $18,774 $1,000 Not Implemented
MA0651 # 06 Y:2009 06 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,725 $18,300 Not Implemented
MA0649 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $2,945 $3,000 Implemented
MA0649 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,212 $10,500 Not Implemented
MA0649 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,617 $63,000 Not Implemented
MA0649 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,752 $85,000 Not Implemented
MA0650 # 04 Y:2009 04 2009 REDUCE VENTILATION AIR $250 $0 Implemented