IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0824 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $10,379 $54,695 Not Implemented
MA0824 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,177 $29,750 Implemented
MA0824 # 05 Y:2020 05 2020 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,491 $6,300 Implemented
MA0824 # 01 Y:2020 01 2020 REPLACE BOILER $15,999 $29,000 Not Implemented
MA0824 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,118 $7,710 Implemented
MA0823 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $76,578 $123,800 Not Implemented
MA0823 # 02 Y:2020 02 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $111,102 $465,300 Not Implemented
MA0823 # 01 Y:2020 01 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $757,206 $3,776,148 Not Implemented
MA0823 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,327 $36,850 Not Implemented
MA0823 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,388 $2,000 Not Implemented
MA0822 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $78,975 $422,509 Implemented
MA0822 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,485 $4,500 Not Implemented
MA0822 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,003 $6,741 Implemented
MA0821 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $23,275 Not Implemented
MA0821 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $997 $1,400 Not Implemented
MA0821 # 04 Y:2020 04 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $490 $1,785 Not Implemented
MA0821 # 01 Y:2020 01 2020 USE MINIMUM SAFE OVEN VENTILATION $48,924 $61,470 Not Implemented
MA0820 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $30,760 $129,192 Not Implemented
MA0820 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,862 $11,220 Not Implemented
MA0820 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,673 $7,900 Not Implemented
MA0820 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $204 $200 Implemented
MA0820 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $723 $300 Implemented
MA0819 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,721 $2,930 Not Implemented
MA0819 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,833 $1,000 Not Implemented
MA0819 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,022 $217,000 Implemented