IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0300 # 05 Y:2000 05 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $5,600 $9,000 Implemented
ME0283 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,294 $300 Implemented
ME0283 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,561 $500 Implemented
ME0280 # 09 Y:1999 09 1999 MODIFY CURRENT INCENTIVE PROGRAM $55,341 $30,500 Implemented
ME0280 # 08 Y:1999 08 1999 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,092 $1,240 Implemented
ME0280 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,402 $4,940 Implemented
ME0280 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,958 $28,528 Implemented
ME0280 # 03 Y:1999 03 1999 MODIFY CURRENT INCENTIVE PROGRAM $15,000 $0 Implemented
ME0280 # 02 Y:1999 02 1999 MOVE PRODUCT USING MECHANICAL MEANS $105,600 $6,000 Implemented
ME0280 # 01 Y:1999 01 1999 INSTALL SENSORS TO DETECT DEFECTS $243,000 $20,108 Implemented
ME0269 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,324 $1,000 Implemented
ME0269 # 12 Y:1999 12 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,273 $1,632 Implemented
ME0269 # 13 Y:1999 13 1999 INSULATE BARE EQUIPMENT $547 $273 Implemented
ME0269 # 15 Y:1999 15 1999 MINIMIZE WATER USAGE $229 $100 Implemented
ME0269 # 10 Y:1999 10 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $2,179 $2,000 Implemented
ME0269 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,202 $10,069 Implemented
ME0269 # 06 Y:1999 06 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,530 $21,460 Implemented
ME0269 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,299 $10,600 Implemented
ME0269 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $4,461 $650 Implemented
ME0269 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,778 $56,288 Implemented
ME0261 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,134 $900 Implemented
ME0261 # 07 Y:1999 07 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,394 $3,080 Implemented
ME0261 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,704 $12,000 Implemented
ME0261 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,535 $25,000 Implemented
ME0261 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,477 $7,909 Implemented