IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0258 # 09 Y:1999 09 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $358 $1,855 Not Implemented
ME0258 # 10 Y:1999 10 1999 INSULATE BARE EQUIPMENT $110 $220 Not Implemented
ME0258 # 01 Y:1999 01 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $75,000 $106,500 Not Implemented
ME0258 # 02 Y:1999 02 1999 MOVE PRODUCT USING MECHANICAL MEANS $74,945 $21,400 Not Implemented
ME0258 # 03 Y:1999 03 1999 RECOVER AND REUSE WASTE MATERIAL $20,000 $1,200 Not Implemented
ME0234 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $38,400 $50,000 Implemented
ME0234 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,979 $12,932 Implemented
ME0234 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,153 $10,580 Implemented
ME0234 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,482 $4,476 Implemented
ME0234 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,284 $800 Implemented
ME0234 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $500 Implemented
ME0234 # 07 Y:1998 07 1998 RECOVER AND REUSE COOLING WATER $12,512 $12,000 Implemented
ME0234 # 08 Y:1998 08 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $150 $0 Not Implemented
ME0234 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,887 $3,000 Not Implemented
ME0234 # 10 Y:1998 10 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,114 $7,000 Implemented
ME0257 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,536 $21,031 Implemented
ME0257 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $7,900 $1,000 Implemented
ME0257 # 03 Y:1999 03 1999 ADVERTISE PRODUCT OR SERVICE $2,993 $0 Implemented
ME0257 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,980 $6,797 Implemented
ME0257 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $2,268 $879 Implemented
ME0257 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $920 $20 Implemented
ME0257 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $702 $300 Implemented
ME0257 # 08 Y:1999 08 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $671 $1,960 Not Implemented
ME0257 # 09 Y:1999 09 1999 REDUCE SCRAP PRODUCTION $66,200 $20,000 Implemented
ME0255 # 01 Y:1998 01 1998 CONTRACT OUT MAINTENANCE $32,242 $75,900 Implemented