IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0208 # 09 Y:1997 09 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $24,276 $6,900 Implemented
ME0208 # 10 Y:1997 10 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $143 $400 Implemented
ME0207 # 01 Y:1997 01 1997 AIR CONDITION ONLY SPACE NECESSARY $7,109 $5,048 Not Implemented
ME0207 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,055 $9,772 Not Implemented
ME0207 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $2,357 $1,200 Not Implemented
ME0207 # 04 Y:1997 04 1997 PAY UTILITY BILLS ON TIME $2,003 $0 Not Implemented
ME0207 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,367 $1,246 Not Implemented
ME0207 # 06 Y:1997 06 1997 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,739 $400 Not Implemented
ME0207 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $932 $1,009 Not Implemented
ME0207 # 08 Y:1997 08 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $723 $0 Not Implemented
ME0207 # 09 Y:1997 09 1997 INSULATE BARE EQUIPMENT $537 $226 Not Implemented
ME0207 # 10 Y:1997 10 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $499 $378 Not Implemented
ME0207 # 11 Y:1997 11 1997 INSULATE BARE EQUIPMENT $465 $150 Not Implemented
ME0207 # 12 Y:1997 12 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $60,813 $30,000 Not Implemented
ME0207 # 13 Y:1997 13 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $2,081 $2,400 Not Implemented
ME0206 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,295 $52,234 n/a
ME0206 # 02 Y:1997 02 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,622 $2,500 n/a
ME0206 # 03 Y:1997 03 1997 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $378 $100 n/a
ME0206 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $367 $150 n/a
ME0206 # 05 Y:1997 05 1997 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $306 $71 n/a
ME0206 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $180 $200 n/a
ME0205 # 01 Y:1996 01 1996 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $115,428 $0 Implemented
ME0205 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,183 $7,572 Implemented
ME0205 # 03 Y:1996 03 1996 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,380 $453 Not Implemented
ME0205 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $1,004 $2,112 Not Implemented