IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0294 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35,523 $60,200 Not Implemented
MZ0294 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $542 $240 Not Implemented
MZ0294 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $50 Implemented
MZ0294 # 04 Y:2020 04 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $519 $160 Not Implemented
MZ0294 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,295 $2,760 Implemented
MZ0294 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,816 $13,638 Not Implemented
MZ0294 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $75,290 $44,400 Not Implemented
MZ0277 # 05 Y:2019 05 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $8,418 $1,920 Not Implemented
MZ0277 # 09 Y:2019 09 2019 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $409 $1,200 Implemented
MZ0277 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,816 $3,021 Implemented
MZ0277 # 07 Y:2019 07 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $70,665 $233,814 Implemented
MZ0277 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $55,889 $160 Implemented
MZ0277 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,650 $2,700 Implemented
MZ0277 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,416 $4,211 Implemented
MZ0277 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,719 $50,000 Not Implemented
MZ0277 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,394 $440 Not Implemented
MZ0065 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $3,000 Implemented
MZ0065 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,240 $0 Not Implemented
MZ0065 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,078 $963 Not Implemented
MZ0065 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,073 $1,500 Implemented
MZ0065 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,566 $20,000 Not Implemented
MZ0065 # 04 Y:2011 04 2011 USE SOLAR HEAT TO HEAT WATER $300 $2,500 Implemented
MZ0065 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $23,154 $100,000 Not Implemented
MZ0065 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,106 $2,120 Implemented