IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0160 # 03 Y:2014 03 2014 REPLACE BOILER $32,000 $65,000 Not Implemented
MZ0160 # 04 Y:2014 04 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $47,644 $117,000 Not Implemented
MZ0160 # 05 Y:2014 05 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,436 $24,000 Not Implemented
MZ0160 # 06 Y:2014 06 2014 ELIMINATE/REDUCE AN OPERATION $7,727 $0 Not Implemented
MZ0160 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,778 $7,000 Not Implemented
MZ0160 # 09 Y:2014 09 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,495 $0 Not Implemented
MZ0160 # 10 Y:2014 10 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,172 $24,000 Not Implemented
MZ0144 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,120 $7,400 Implemented
MZ0144 # 01 Y:2014 01 2014 COVER OPEN TANKS $6,406 $5,250 Not Implemented
MZ0144 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $9,563 $12,000 Implemented
MZ0144 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $824 $900 Implemented
MZ0144 # 04 Y:2014 04 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,431 $4,400 Not Implemented
MZ0144 # 06 Y:2014 06 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,940 $5,500 Not Implemented
MZ0144 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,683 $15,640 Implemented
MZ0115 # 10 Y:2013 10 2013 CONDENSE OPERATION INTO ONE BUILDING $99,466 $35,000 Implemented
MZ0115 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,362 $1,500 Implemented
MZ0115 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,543 $1,160 Implemented
MZ0115 # 07 Y:2013 07 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,261 $750 Not Implemented
MZ0115 # 06 Y:2013 06 2013 USE PHOTOCELL CONTROLS $2,832 $750 Not Implemented
MZ0115 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,874 $204,750 Implemented
MZ0115 # 04 Y:2013 04 2013 ELIMINATE/REDUCE AN OPERATION $11,784 $0 Implemented
MZ0115 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,027 $1,600 Implemented
MZ0115 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,448 $2,450 Not Implemented
MZ0115 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,884 $3,658 Not Implemented
MZ0054 # 02 Y:2010 02 2010 INSULATE BARE EQUIPMENT $3,852 $940 Not Implemented