IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,391

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0559 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $494 $347 Implemented
NC0559 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,085 $1,000 Implemented
NC0559 # 15 Y:2016 15 2016 DEVELOP A REPAIR/REPLACE POLICY $2,264 $4,256 Implemented
NC0559 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,787 $1,000 Implemented
NC0559 # 03 Y:2016 03 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,003 $1,000 Implemented
NC0559 # 06 Y:2016 06 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,950 $25,000 Implemented
NC0559 # 07 Y:2016 07 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $34,146 $10,000 Implemented
NC0559 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,231 $2,000 Implemented
NC0558 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,925 $300 Implemented
NC0558 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $16,078 $5,000 Implemented
NC0558 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,947 $6,425 Implemented
NC0558 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,031 $227 Implemented
NC0558 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $296 $80 Implemented
NC0558 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $288 $372 Implemented
NC0558 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $145 $716 Implemented
NC0558 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $1,595 Implemented
NC0556 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $59,808 $90,000 Implemented
NC0556 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,438 $12,000 Implemented
NC0556 # 05 Y:2015 05 2015 DEVELOP A REPAIR/REPLACE POLICY $1,836 $4,256 Implemented
NC0556 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,584 $8,350 Implemented
NC0556 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $578 $868 Implemented
NC0552 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99,030 $1,000 Implemented
NC0552 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,528 $150 Implemented
NC0552 # 12 Y:2015 12 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $165,594 $3,000 Implemented
NC0552 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,081 $320 Implemented