IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0334 # 05 Y:2006 05 2006 REDUCE VENTILATION AIR $10,892 $4,000 Implemented
NC0334 # 06 Y:2006 06 2006 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,773 $1,300 Implemented
NC0334 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,065 $0 Implemented
NC0334 # 08 Y:2006 08 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,306 $8,000 Implemented
NC0334 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $5,061 $3,300 Implemented
NC0334 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,095 $100 Implemented
NC0334 # 11 Y:2006 11 2006 RECOVER WASTE HEAT FROM EQUIPMENT $9,138 $9,824 Not Implemented
NC0334 # 12 Y:2006 12 2006 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $5,012 $4,200 Not Implemented
NC0333 # 01 Y:2006 01 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $25,187 $9,000 Not Implemented
NC0333 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,607 $4,635 Not Implemented
NC0333 # 03 Y:2006 03 2006 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,142 $1,000 Not Implemented
NC0333 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $50 Not Implemented
NC0333 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,913 $300 Implemented
NC0333 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $395 $150 Implemented
NC0333 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $135 $185 Implemented
NC0333 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $278 $100 Implemented
NC0333 # 09 Y:2006 09 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,628 $3,000 Not Implemented
NC0333 # 10 Y:2006 10 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,550 $4,000 Not Implemented
NC0332 # 01 Y:2006 01 2006 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $20,455 $12,000 Not Implemented
NC0332 # 02 Y:2006 02 2006 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $39,950 $210,000 Not Implemented
NC0332 # 03 Y:2006 03 2006 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $17,210 $28,200 Not Implemented
NC0332 # 04 Y:2006 04 2006 INSULATE FEEDWATER TANK $389 $277 Not Implemented
NC0332 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $406 $86 Not Implemented
NC0331 # 01 Y:2006 01 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,898 $0 Not Implemented
NC0331 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,341 $500 Not Implemented