IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0208 # 02 Y:2001 02 2001 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $45,000 $21,500 Not Implemented
NC0208 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,700 Implemented
NC0208 # 04 Y:2001 04 2001 USE PHOTOCELL CONTROLS $113 $200 Implemented
NC0208 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $792 $100 Implemented
NC0208 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $200 Not Implemented
NC0208 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $22,836 $6,500 Implemented
NC0228 # 01 Y:2002 01 2002 $296,000 $75,000 n/a
NC0228 # 02 Y:2002 02 2002 USE COMPRESSOR AIR FILTERS $41,667 $10,600 n/a
NC0228 # 03 Y:2002 03 2002 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $173,756 $88,000 n/a
NC0228 # 04 Y:2002 04 2002 REDESIGN PROCESS $74,974 $100,000 n/a
NC0228 # 05 Y:2002 05 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $12,426 $39,808 n/a
NC0226 # 01 Y:2001 01 2001 DEVELOP A REPAIR/REPLACE POLICY $10,828 $12,834 Not Implemented
NC0226 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,348 $500 Not Implemented
NC0226 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,071 $407 Not Implemented
NC0226 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,800 $400 Not Implemented
NC0226 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $1,122 $2,225 Not Implemented
NC0226 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $279 $150 Not Implemented
NC0226 # 07 Y:2001 07 2001 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $23,668 $26,000 Not Implemented
NC0226 # 08 Y:2001 08 2001 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $93,403 $-312,000 Not Implemented
NC0227 # 01 Y:2001 01 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,391 $250 Not Implemented
NC0227 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $15,815 $30,000 Not Implemented
NC0227 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $662 $308 Not Implemented
NC0227 # 04 Y:2001 04 2001 IMPROVE COMBUSTION CONTROL CAPABILITY $89,586 $60,000 Not Implemented
NC0227 # 05 Y:2001 05 2001 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $30,612 $50,000 Not Implemented
NC0227 # 06 Y:2001 06 2001 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $200,000 $35,000 Not Implemented