IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,985

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0079 # 04 Y:1996 04 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,117 $3,000 Not Implemented
NC0079 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $6,000 Not Implemented
NC0079 # 06 Y:1996 06 1996 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,641 $6,000 Not Implemented
NC0079 # 07 Y:1996 07 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,705 $2,500 Not Implemented
NC0079 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,851 $200 Not Implemented
NC0081 # 01 Y:1996 01 1996 DISCONNECT BALLASTS $800 $2,060 Implemented
NC0081 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,438 $17,250 Implemented
NC0081 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,043 $53,739 Implemented
NC0081 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $558 $480 Implemented
NC0081 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,626 $2,640 Implemented
NC0081 # 06 Y:1996 06 1996 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,258 $25,000 Implemented
NC0081 # 07 Y:1996 07 1996 AIR CONDITION ONLY SPACE NECESSARY $968 $1,500 Not Implemented
NC0081 # 08 Y:1996 08 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,816 $0 Not Implemented
NC0081 # 09 Y:1996 09 1996 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $9,000 $8,000 Not Implemented
NC0081 # 10 Y:1996 10 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,170 $25,000 Not Implemented
NC0085 # 01 Y:1996 01 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $144 $0 Not Implemented
NC0085 # 02 Y:1996 02 1996 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $14,587 $25,400 Not Implemented
NC0085 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $738 $600 Implemented
NC0085 # 04 Y:1996 04 1996 CHECK FOR ACCURACY OF UTILITY / POWER METERS $594 $0 Not Implemented
NC0085 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $910 $520 Implemented
NC0085 # 06 Y:1996 06 1996 USE PHOTOCELL CONTROLS $1,271 $0 Not Implemented
NC0085 # 07 Y:1996 07 1996 USE LESS WASTEFUL PACKAGING $437 $0 Implemented
NC0086 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $69 $112 Implemented
NC0086 # 02 Y:1996 02 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $541 $0 Implemented
NC0086 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $900 Implemented