IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0167 # 02 Y:1999 02 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,230 $19,535 Not Implemented
NC0167 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $489 $1,100 Not Implemented
NC0167 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,229 $5,323 Implemented
NC0167 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $503 $143 Implemented
NC0167 # 06 Y:1999 06 1999 BURN WOOD BY-PRODUCTS FOR HEAT $22,545 $80,500 Not Implemented
NC0167 # 07 Y:1999 07 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $43,740 $9,500 Not Implemented
NC0167 # 08 Y:1999 08 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $25,000 $1,000 Implemented
NC0165 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,720 $10,000 Implemented
NC0165 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,539 $1,500 Implemented
NC0165 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $151,290 $29,000 Implemented
NC0165 # 04 Y:1999 04 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $231,300 $1,600,000 Not Implemented
NC0165 # 05 Y:1999 05 1999 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $824,740 $836,000 Implemented
NC0166 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $756 $1,500 Implemented
NC0166 # 02 Y:1999 02 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,877 $15,000 Not Implemented
NC0166 # 03 Y:1999 03 1999 USE PHOTOCELL CONTROLS $601 $150 Implemented
NC0166 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,328 $5,000 Not Implemented
NC0166 # 05 Y:1999 05 1999 INSULATE FEEDWATER TANK $328 $340 Implemented
NC0166 # 06 Y:1999 06 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $645 $800 Not Implemented
NC0166 # 07 Y:1999 07 1999 BURN WOOD BY-PRODUCTS FOR HEAT $12,902 $62,200 Not Implemented
NC0166 # 08 Y:1999 08 1999 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $29,365 $82,000 Not Implemented
NC0166 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $14,000 $15,500 Implemented
NC0166 # 10 Y:1999 10 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $7,700 $1,000 Implemented
NC0164 # 01 Y:1999 01 1999 ADJUST BURNERS FOR EFFICIENT OPERATION $8,380 $700 Implemented
NC0164 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18 $1,345 Not Implemented
NC0164 # 03 Y:1999 03 1999 INSTALL SKYLIGHTS $4,672 $35,090 Implemented