IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0141 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,048 $4,000 Implemented
NC0141 # 05 Y:1998 05 1998 INSTALL TURBULATORS $11,553 $3,500 Not Implemented
NC0141 # 06 Y:1998 06 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $6,874 $0 Not Implemented
NC0141 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,861 $200 Implemented
NC0141 # 08 Y:1998 08 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $124,752 $270,000 Not Implemented
NC0141 # 09 Y:1998 09 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $22,000 $67,000 Not Implemented
NC0141 # 10 Y:1998 10 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $14,000 $50,000 Not Implemented
NC0151 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,157 $600 Not Implemented
NC0151 # 02 Y:1998 02 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $33,411 $132,700 Not Implemented
NC0151 # 03 Y:1998 03 1998 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $401 $1,500 Not Implemented
NC0151 # 04 Y:1998 04 1998 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $700 $2,100 Not Implemented
NC0151 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,290 $3,000 Not Implemented
NC0151 # 06 Y:1998 06 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,822 $15,000 Not Implemented
NC0151 # 07 Y:1998 07 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $11,500 $45,000 Not Implemented
NC0151 # 08 Y:1998 08 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $4,721 $16,000 Not Implemented
NC0145 # 01 Y:1998 01 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,611 $25,000 Not Implemented
NC0145 # 02 Y:1998 02 1998 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $33,755 $125,000 Not Implemented
NC0145 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $434 $25 Not Implemented
NC0145 # 04 Y:1998 04 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,308 $200 Not Implemented
NC0145 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,875 $100 Implemented
NC0145 # 06 Y:1998 06 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,125 $150 Implemented
NC0145 # 07 Y:1998 07 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,088 $1,200 Not Implemented
NC0145 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $111,500 $405,000 Not Implemented
NC0149 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $79,194 $118,650 Not Implemented
NC0149 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,438 $100 Implemented