Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,176
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0141 # 04 Y:1998 | 04 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $31,048 | $4,000 | Implemented |
NC0141 # 05 Y:1998 | 05 | 1998 | INSTALL TURBULATORS | $11,553 | $3,500 | Not Implemented |
NC0141 # 06 Y:1998 | 06 | 1998 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,874 | $0 | Not Implemented |
NC0141 # 07 Y:1998 | 07 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,861 | $200 | Implemented |
NC0141 # 08 Y:1998 | 08 | 1998 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $124,752 | $270,000 | Not Implemented |
NC0141 # 09 Y:1998 | 09 | 1998 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $22,000 | $67,000 | Not Implemented |
NC0141 # 10 Y:1998 | 10 | 1998 | INSTALL EQUIPMENT TO MOVE PRODUCT | $14,000 | $50,000 | Not Implemented |
NC0151 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,157 | $600 | Not Implemented |
NC0151 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $33,411 | $132,700 | Not Implemented |
NC0151 # 03 Y:1998 | 03 | 1998 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $401 | $1,500 | Not Implemented |
NC0151 # 04 Y:1998 | 04 | 1998 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $700 | $2,100 | Not Implemented |
NC0151 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,290 | $3,000 | Not Implemented |
NC0151 # 06 Y:1998 | 06 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,822 | $15,000 | Not Implemented |
NC0151 # 07 Y:1998 | 07 | 1998 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $11,500 | $45,000 | Not Implemented |
NC0151 # 08 Y:1998 | 08 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,721 | $16,000 | Not Implemented |
NC0145 # 01 Y:1998 | 01 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,611 | $25,000 | Not Implemented |
NC0145 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $33,755 | $125,000 | Not Implemented |
NC0145 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $434 | $25 | Not Implemented |
NC0145 # 04 Y:1998 | 04 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,308 | $200 | Not Implemented |
NC0145 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $22,875 | $100 | Implemented |
NC0145 # 06 Y:1998 | 06 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,125 | $150 | Implemented |
NC0145 # 07 Y:1998 | 07 | 1998 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,088 | $1,200 | Not Implemented |
NC0145 # 08 Y:1998 | 08 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $111,500 | $405,000 | Not Implemented |
NC0149 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $79,194 | $118,650 | Not Implemented |
NC0149 # 02 Y:1998 | 02 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,438 | $100 | Implemented |