IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

803

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0344 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,686 $4,423 Implemented
NC0343 # 01 Y:2006 01 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $137,000 $28,000 Not Implemented
NC0343 # 02 Y:2006 02 2006 REDESIGN PROCESS $54,257 $30,000 Not Implemented
NC0343 # 03 Y:2006 03 2006 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $73,265 $260,000 Not Implemented
NC0343 # 04 Y:2006 04 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,719 $10,000 Not Implemented
NC0343 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,598 $14,000 Not Implemented
NC0343 # 06 Y:2006 06 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,384 $3,000 Not Implemented
NC0343 # 07 Y:2006 07 2006 INSTALL SENSORS TO DETECT DEFECTS $1,350,000 $800,000 Not Implemented
NC0343 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $424 Not Implemented
NC0339 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $227,235 $231,600 Not Implemented
NC0339 # 02 Y:2006 02 2006 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $675,393 $100,000 Not Implemented
NC0339 # 03 Y:2006 03 2006 REPAIR AND ELIMINATE STEAM LEAKS $41,056 $10,000 Implemented
NC0339 # 04 Y:2006 04 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $93,691 $100,000 Implemented
NC0339 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $64,630 $11,200 Not Implemented
NC0339 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,853 $20,000 Implemented
NC0339 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,136 $1,407 Implemented
NC0339 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,369 $50 Implemented
NC0337 # 01 Y:2006 01 2006 REDUCE VENTILATION AIR $92,067 $50,000 Not Implemented
NC0337 # 02 Y:2006 02 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,276 $18,000 Not Implemented
NC0337 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $9,180 $18,000 Implemented
NC0337 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $723 $723 Implemented
NC0337 # 05 Y:2006 05 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $10,650 $5,000 Not Implemented
NC0337 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,350 $3,430 Not Implemented
NC0337 # 07 Y:2006 07 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $23,249 $11,746 Not Implemented
NC0337 # 08 Y:2006 08 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,069 $19,441 Not Implemented