IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,985

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0491 # 02 Y:2013 02 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,220 $31,024 Not Implemented
NC0491 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $4,950 Not Implemented
NC0491 # 04 Y:2013 04 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,591 $10,980 Not Implemented
NC0491 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,248 $11,314 Implemented
NC0491 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $100 Implemented
NC0488 # 01 Y:2013 01 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $83,386 $250,000 Not Implemented
NC0488 # 02 Y:2013 02 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,453 $300 Implemented
NC0488 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $100 Implemented
NC0488 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $741 $2,535 Not Implemented
NC0488 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,111 $1,500 Not Implemented
NC0488 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $600 Implemented
NC0488 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,980 $19,622 Implemented
NC0488 # 08 Y:2013 08 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $496 $0 Not Implemented
NC0487 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,586 $9,967 Implemented
NC0487 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $143 $812 Implemented
NC0487 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $301 $100 Implemented
NC0487 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $840 Implemented
NC0487 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $736 $1,200 Not Implemented
NC0487 # 06 Y:2013 06 2013 USE RADIANT HEATER FOR SPOT HEATING $564 $1,325 Not Implemented
NC0487 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $202 $50 Not Implemented
NC0485 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,649 $108,665 Implemented
NC0485 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $2,016 $7,315 Implemented
NC0485 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $2,647 $3,750 Implemented
NC0485 # 04 Y:2013 04 2013 REPAIR OR REPLACE STEAM TRAPS $167,046 $6,100 Implemented
NC0485 # 05 Y:2013 05 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,936 $300 Not Implemented