IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,985

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0361 # 09 Y:2007 09 2007 KEEP BOILER TUBES CLEAN $1,550 $2,395 Not Implemented
NC0361 # 10 Y:2007 10 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $553 $0 Not Implemented
NC0361 # 11 Y:2007 11 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $376 $1,000 Not Implemented
NC0356 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,291 $30,000 Not Implemented
NC0356 # 02 Y:2007 02 2007 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $20,393 $10,000 Implemented
NC0356 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,040 $13,725 Not Implemented
NC0356 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,456 $100 Implemented
NC0356 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $798 $500 Not Implemented
NC0357 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,234 $78,000 Not Implemented
NC0357 # 02 Y:2007 02 2007 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $16,558 $5,600 Not Implemented
NC0357 # 03 Y:2007 03 2007 DEVELOP A REPAIR/REPLACE POLICY $699 $375 Not Implemented
NC0357 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,527 $4,761 Not Implemented
NC0357 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $277 $100 Implemented
NC0354 # 01 Y:2007 01 2007 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $39,874 $45,600 Not Implemented
NC0354 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $32,774 $100,000 Not Implemented
NC0354 # 03 Y:2007 03 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $65,972 $100,000 Not Implemented
NC0354 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,076 $2,000 Not Implemented
NC0354 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,375 $100 Implemented
NC0354 # 06 Y:2007 06 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $7,411 $2,000 Implemented
NC0354 # 07 Y:2007 07 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,714 $1,000 Not Implemented
NC0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,936 $2,559 Implemented
NC0353 # 01 Y:2007 01 2007 DEVELOP A REPAIR/REPLACE POLICY $17,011 $10,953 Implemented
NC0353 # 02 Y:2007 02 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $9,457 $1,526 Implemented
NC0353 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $3,562 $3,000 Implemented
NC0353 # 04 Y:2007 04 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,308 $2,000 Implemented