Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,176
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0442 # 05 Y:2012 | 05 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $3,045 | $6,067 | Implemented |
NC0442 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,418 | $9,330 | Implemented |
NC0442 # 07 Y:2012 | 07 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $977 | $231 | Implemented |
NC0442 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,227 | $300 | Implemented |
NC0446 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $171,632 | $1,063,000 | Not Implemented |
NC0446 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $92,397 | $210,000 | Not Implemented |
NC0446 # 03 Y:2012 | 03 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $108,281 | $84,000 | Not Implemented |
NC0446 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,073 | $4,900 | Implemented |
NC0446 # 05 Y:2012 | 05 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $44,845 | $120,000 | Not Implemented |
NC0446 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,188 | $0 | Not Implemented |
NC0446 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,560 | $100 | Implemented |
NC0446 # 08 Y:2012 | 08 | 2012 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,979 | $8,800 | Not Implemented |
NC0446 # 09 Y:2012 | 09 | 2012 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $28,690 | $71,725 | Not Implemented |
NC0445 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,196 | $0 | Implemented |
NC0445 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $575 | $100 | Implemented |
NC0445 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,573 | $7,197 | Not Implemented |
NC0445 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $17,271 | $73,750 | Not Implemented |
NC0445 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $336 | $126 | Implemented |
NC0445 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,698 | $7,891 | Implemented |
NC0444 # 01 Y:2012 | 01 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,257 | $2,000 | Implemented |
NC0444 # 02 Y:2012 | 02 | 2012 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $3,445 | $8,500 | Not Implemented |
NC0444 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,731 | $500 | Implemented |
NC0444 # 04 Y:2012 | 04 | 2012 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,902 | $4,000 | Implemented |
NC0444 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,178 | $971 | Implemented |
NC0444 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,844 | $62,067 | Not Implemented |