Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,985
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0294 # 02 Y:2004 | 02 | 2004 | ADD ADDITIONAL PRODUCTION SHIFT | $17,395 | $5,000 | Not Implemented |
NC0294 # 03 Y:2004 | 03 | 2004 | REDESIGN PROCESS | $9,178 | $2,200 | Not Implemented |
NC0294 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $600 | $100 | Implemented |
NC0294 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,102 | $9,225 | Implemented |
NC0287 # 01 Y:2004 | 01 | 2004 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $10,282 | $9,879 | Not Implemented |
NC0287 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,536 | $1,096 | Not Implemented |
NC0287 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $615 | $100 | Implemented |
NC0287 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,732 | $700 | Implemented |
NC0287 # 05 Y:2004 | 05 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,915 | $750 | Implemented |
NC0287 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $803 | $1,570 | Not Implemented |
NC0290 # 01 Y:2004 | 01 | 2004 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $145,703 | $276,000 | Implemented |
NC0290 # 02 Y:2004 | 02 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $9,371 | $4,079 | Not Implemented |
NC0290 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,085 | $5,500 | Not Implemented |
NC0290 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $2,865 | $9,174 | Not Implemented |
NC0290 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,206 | $2,269 | Not Implemented |
NC0290 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $612 | $100 | Implemented |
NC0290 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,346 | $2,533 | Implemented |
NC0299 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $418,000 | $275,000 | Implemented |
NC0299 # 02 Y:2004 | 02 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $38,998 | $1,000 | Implemented |
NC0299 # 03 Y:2004 | 03 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,352 | $1,030 | Implemented |
NC0299 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,143 | $1,622 | Implemented |
NC0299 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,382 | $9,255 | Not Implemented |
NC0299 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $373 | $100 | Implemented |
NC0299 # 07 Y:2004 | 07 | 2004 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $895 | $2,195 | Implemented |
NC0298 # 01 Y:2004 | 01 | 2004 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $9,750 | $0 | Implemented |